Yifan Strength
Fuchuan Yifan has six production workshops, among which the maximum lifting capacity of Wind Power Equipment workshop is 400t, and the overall annual production capacity is more than 200,000t. The factory layout is strictly in accordance with the world's advanced wind tower professional manufacture technology and process, smooth logistics, advanced equipment, digitalization and informatization degree leading in the industry.
Fuchuan Yifan has a welding laboratory to provide welding technical support for all kinds of high-end equipment manufacture.
Which set up a welding training center, a welding test center, a welding showroom, a welding process room, and a welding information control center ect.
Quality Assurance